Skip to main content

BHP to build solar farms to help power mines at Nickel West

Published by , Editor
Global Mining Review,


BHP and its power partner in the Goldfields TransAlta are to build two solar farms and a battery storage system to help power the Mt Keith and Leinster operations at Nickel West. This will help BHP reduce emissions from electricity use at Mt Keith and Leinster by 12%, based on FY20 levels.

The Northern Goldfields Solar Project will include a 27.4 MW solar farm at Mt Keith and a 10.7 MW solar farm and 10.1 MW battery at Leinster, and will displace power currently supplied by diesel and gas turbine generation.

This will result in an estimated reduction of 540 000 t of CO2e over the first 10 years of operation. This is the equivalent of removing up to 23 000 combustion engine cars from the road every year.

BHP commissioned the solar farms and battery to be built, owned, and operated by TransAlta as part of the power purchase agreement (PPA) extension signed in October 2020. Construction will commence in 2Q FY22, is expected to take 12 – 14 months, and at its peak will employ over 100 people on site.

BHP Nickel West, Asset President, Eddy Haegel said: “This is the first large-scale onsite solar farm and battery that BHP has commissioned at any of its global operations.

“The Northern Goldfields Solar Project will further improve our position as one of the lowest carbon nickel miners in the world. It will reduce emissions from electricity use at Mt Keith and Leinster by 12%, reduce fuel costs and improve the reliability of our electricity supply with the addition of the battery storage system.

“This announcement follows the nickel supply agreement we signed with Tesla last week. Sustainable low carbon nickel is essential for our battery and electric vehicle customers.”

TransAlta Corp. President and CEO, John Kousinioris, added: “We are proud to be supporting BHP’s emissions reduction targets and sustainability goals through the expansion of our renewable generation footprint into Australia.”

The partnership will contribute to BHP’s medium-term target to reduce Scope 1 and 2 emissions from its operated assets by at least 30% from FY20 levels by FY30.

The project is subject to final Western Australia state government approvals.

Read the article online at: https://www.globalminingreview.com/environment-sustainability/30072021/bhp-to-build-solar-farms-to-help-power-mines-at-nickel-west/

You might also like

The misleading prices of rare earths

Ramon Barua, CEO, Aclara Resources, examines the disconnect between rare earths’ critical role and its current market reality, and how it poses significant challenges for the future of energy and technological advancements to meet climate goals.

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Australian mining news BHP Billiton news Nickel mining news