Standard Lithium files assessment report for South-West Arkansas Lithium Project
Published by Will Owen,
Editor
Global Mining Review,
Standard Lithium Ltd. has filed a Preliminary Economic Assessment Report for its South-West Arkansas Lithium Project.
The technical report, entitled ‘Preliminary Economic Assessment of SW Arkansas Lithium Project’, was prepared by independent consulting companies: NORAM, Hunt, Guillot & Associates (HGA), APEX Geoscience Ltd., ECCI, Matrix Solutions Inc., and METNETH2O Inc.
Key points:
- Pre-tax US$2.83 billion NPV at 8% discount rate and IRR of 40.5%.
- After-tax US$1.97 billion NPV at 8% discount rate and IRR of 32.1%.
- 20-year mine-life producing an average of 30 000 tpy of battery-quality lithium hydroxide monohydrate (LHM).
- Operating costs of US$2599/t of battery quality lithium hydroxide.
- AACE Class 5 Total CAPEX estimate of US$870 million including conservative 25% contingency of direct capital costs.
- SW Arkansas Lithium Project PEA lithium brine resource is updated to consider the potential unitised area of production, leading to an increased total (global) in-situ resource of 1.19 million t of lithium carbonate equivalent (LCE) at the Inferred Category.
Read the article online at: https://www.globalminingreview.com/mining/29112021/standard-lithium-files-assessment-report-for-south-west-arkansas-lithium-project/
You might also like
Closing the gap: Integrating tailings storage facility closure into mine lifecycle planning
Dr Emma Gagen and Dr Sally Inis, ICMM, lay out key principles for optimising closure outcomes from tailings storage facilities to create lasting social, economic, and environmental benefits.