Rio Tinto provides update on iron ore guidance
Published by Stephanie Roker,
Editor
Global Mining Review,
Rio Tinto Iron Ore is currently experiencing mine operational challenges, particularly in the Greater Brockman hub in the Pilbara. This is resulting in a higher proportion of certain lower grade products, partly to protect the quality of its flagship Pilbara Blend.
Around 1.5 million t of these products were sold in the first quarter, as noted in the 2019 Quarterly Operations Review, 16 April 2019. Additional sales of these products will be made during 2019.
In light of these challenges, there has also been a review of mine plans, resulting in guidance of Pilbara shipments (100% basis) for 2019 being revised to between 320 million t and 330 million t (previously between 333 million t and 343 million t). Given the change in volume guidance, unit costs will be updated in the Q2 Quarterly Operations Review (16 July 2019).
Read the article online at: https://www.globalminingreview.com/mining/20062019/rio-tinto-provides-update-on-iron-ore-guidance/
You might also like
Komatsu and SMS Equipment debut the first PC9000 in Canada
Komatsu Germany Mining Division and SMS Equipment unveiled the first Komatsu PC9000 hydraulic mining excavator during an official handover ceremony at Suncor’s Fort Hills mine in Canada.