Skip to main content

Leaching started at Mexus’ Santa Elena mine

Published by , Editorial Assistant
Global Mining Review,


Mexus Gold US announced that leaching has started on 9000 t of mineralised material at its Santa Elena mine in Caborca, Sonora State, Mexico. The company expects this initial leaching to yield approximately 100 oz. of gold.

Mexus President Paul Thompson added: “All elements of the companies mining systems are now in place which will allow for continuous operation with steady production.”

Read the article online at: https://www.globalminingreview.com/mining/14112019/leaching-started-at-mexus-santa-elena-mine/

You might also like

Passive dust control at conveyor transfer points

Todd Swinderman, CEO Emeritus, Martin Engineering, explains how passive dust control methods used at conveyor points can reduce maintenance and improve workplace air quality without electrical air cleaners or HVAC.

 
 

Embed article link: (copy the HTML code below):