Skip to main content

Jacobs Engineering to carry out copper cathode production facility PFS in Peru

Published by , Assistant Editor
Global Mining Review,


Jacobs Engineering Group Inc. has been selected by Teck Resources Ltd and Aurubis AG to perform the pre-feasibility study (PFS) for a proposed copper cathode production facility in Peru. 

Under the terms of the contract, Jacobs will provide CAPEX and OPEX estimates to Canadian resource company Teck, and Aurubis, the world’s largest copper recycler headquartered in Hamburg, Germany, for determining project pre-feasibility.

Teck and Aurubis’ conceptual copper cathode production facility would incorporate their proprietary CESL copper-arsenic process technology – providing high copper and precious metal recoveries, controlled arsenic deportment, and reduced environmental impact compared to traditional pyrometallurgical smelter processing facilities in respect to air, dust and water.

“We have extensive experience in delivering full life-cycle solutions to copper processing facility owners and operators and more than 40 years of working alongside Teck,” said Jacobs Mining and Minerals and Specialty Chemicals Senior Vice President and General Manager, Andrew Berryman.

“Our collaboration with Teck and Aurubis will support project and business objectives for the company’s proposed copper cathode production facility,” Berryman continued.

Read the article online at: https://www.globalminingreview.com/handling-processing/30102017/jacobs-engineering-to-carry-out-copper-cathode-production-facility-pfs-in-peru/

You might also like

 
 

Embed article link: (copy the HTML code below):