Taseko announces increase in annual copper production from Gibraltar mine
Published by Jane Bentham,
Editorial Assistant
Global Mining Review,
Taseko Mines Limited has announced that the Gibraltar mine produced 34 million lb of copper and 369 000 lb of molybdenum in 4Q23.
For the full year, Gibraltar produced 123 million lb of copper, well above guidance and 26% higher than the previous year.
Copper production in the fourth quarter was supported by strong copper grades of 0.27% with ore from the lower benches of the Gibraltar pit. Mill throughput in the quarter averaged 83 000 t per day and was impacted by additional downtime for maintenance and monitoring of the ball mill in concentrator #2.
Copper sales volumes in the fourth quarter were 36 million lb, and year-end concentrate inventories remained above normal levels.
Stuart McDonald, President and CEO of Taseko, commented: “The strong finish to 2023 is expected to continue in 2024 as the Gibraltar pit will remain the main source of ore for the first half of this year.”
Read the article online at: https://www.globalminingreview.com/exploration-development/11012024/taseko-announces-increase-in-annual-copper-production-from-gibraltar-mine/
You might also like
MIT-Spinout SiTration and BHP launch Arizona pilot to trial copper recovery technology at historic BHP mine site
As demand for copper accelerates, SiTration and BHP are excited to announce the launch of two pilot deployments to trial SiTration’s valorisation technology in the historic Globe-Miami mining district of Arizona at BHP’s Copper Cities site.