Gold mining news
Ariana reports on Kizilcukur drilling and new geophysical targets
Ariana Resources has announced positive results from an airborne magnetic survey and the commencement of drilling at the Kizilcukur Project of the Kiziltepe Sector, Turkey.
World’s largest gold mining complex deploys Micromine FMS
Micromine has successfully implemented its innovative fleet management system (FMS) and mine control solution, Micromine Pitram, at Nevada Gold Mines’ new Goldrush underground mine.
Alba Mineral Resources issues Clogau update
The Lower Llechfraith workings have all the key geological characteristics for the occurrence of high-grade gold mineralisation, including greenstone sills, Clogau Shales, and structural complexity in the lode itself.
FLSmidth to deliver MissionZero processing equipment to Australian gold mine
Northern Star Resources has placed an order for a wide range of FLSmidth mineral processing technologies for its Kalgoorlie Consolidated Gold Mines mill expansion project.
Zenith Energy and Northern Star Resources sign long-term renewable energy PPA
In just over six months Liontown Resources’ Kathleen Valley project, Bellevue Gold’s project, AngloGold Ashanti’s Tropicana, and now Northern Star’s Jundee mining operation have all signed PPA’s for four of Australia’s largest off-grid hybrid renewable energy projects.
Positive pre-feasibility study at the Doropo Gold Project
Definitive feasibility study (DFS) and environmental and social impact assessment (ESIA) completion expected in 1H24 ahead of mining license submission deadline.
Drilling commences at Greatland Gold and Rio Tinto JV the Paterson South Project
Drilling will commence shortly at the Decka target which is a combined magnetic and conductive anomaly within Proterozoic sediments, similar to Havieron.
AngloGold Ashanti to power Tropicana Gold with renewable energy
AngloGold Ashanti Australia Ltd has agreed to build one of the largest renewable energy projects in Australia’s natural resource sector and to integrate it into the power supply for the Tropicana Gold Mine.
Drilling to re-commence at Mila Resources’ Kathleen Valley project
The programme consists of a Six-hole reverse circulation (RC) programme for 820 m with depths from 90 – 180 m building on the 2022 programme which confirmed consistent, high-grade mineralisation at Kathleen Valley.
American Pacific’s Constantine JV commences drilling at Palmer
American Pacific Mining Corp. has announced its 2023 drill programme has commenced at the Palmer Project, located in the Porcupine Mining District of the Haines Borough, Alaska.