
US Gold Corp. provide PFS update
US Gold Corp. has provided an update on the pre-feasibility study (PFS) in progress at the CK Gold Project, located just outside of Cheyenne, Wyoming, USA.
Stay up to date with the latest news and updates from the mining industry.

US Gold Corp. has provided an update on the pre-feasibility study (PFS) in progress at the CK Gold Project, located just outside of Cheyenne, Wyoming, USA.

ClearBlade has announced that it plans to collaborate with IBM to deliver Edge IoT asset monitoring for near-real time asset management.

Gold-backed ETFs and similar products (gold ETFs) recorded their 11th consecutive month of net inflows during October, matching the record number of positive monthly flows set in April 2006.

Orica has been awarded the 5-year explosives technology and services contract for Glencore’s Australian copper and zinc operations, effective January 2021.

Varel Mining and Industrial is changing its name to Terelion.

Rockfire Resources plc has announced the results of four additional diamond drill holes from the July to September 2020 drilling campaign at the 100%-owned Plateau gold deposit in North Queensland, Australia.

FLSmidth has launched the digitally-enabled TSUV Gyratory Crusher, delivering the lowest total cost per metric tonne, even when crushing the most challenging ore.

Northern Vertex Mining Corp. has announced plans to proceed with an accelerated US$2.5 million, 13 700 m Phase II infill drilling and resource expansion programme on its 100% owned Moss Mine project.

Motorola Solutions is launching its next-generation terrestrial trunked radio (TETRA) device, the MXP600, to meet the needs of the transportation sector.

Rio Tinto’s Argyle mine in the remote east Kimberley region of Western Australia has celebrated its final day of mining.

Bis is one of four Australian mining industry companies selected to participate in the METS Ignited innovative new Wireless Industrial Sensor Environment Programme, launching in November.

Peter Johansson, ABB's Contract Manager for Service, and Erik Bohman, Service Manager Motors and Generators in Sweden, explain the background to a revival that saw the Kaunisvaara mine set a new production record by processing over 7000 tpd of iron ore concentrate.