
Artemis orders primary and ancillary mining fleet from Finning
Artemis Gold Inc. has issued a purchase order to Finning for the primary and ancillary mining fleet required for the initial Phase 1 of operations at the Blackwater Mine.
Stay up to date with the latest news and updates from the mining industry.

Artemis Gold Inc. has issued a purchase order to Finning for the primary and ancillary mining fleet required for the initial Phase 1 of operations at the Blackwater Mine.

The operational update is for the Segilola Gold mine, located in Nigeria, and for the company's mineral exploration properties located in Nigeria, Senegal, and Burkina Faso for 1Q23.

The solution enables users to simultaneously design, populate, manage, and effectively share block models while centrally managing the massive amount of sample points, variables, and outputs associated with orebody data.

The existing casting centre will be expanded to include new state-of-the-art equipment such as furnaces, a casting pit, coolers, handling, inspection, sawing and packaging systems.

BHP has announced that OZ Minerals Ltd (OZL) shareholders have approved the scheme of arrangement for BHP Lonsdale Investments to acquire 100% of the shares in OZL.

Arafura Rare Earths Ltd has announced the signing of an offtake agreement with Siemens Gamesa Renewable Energy A/S – the global wind turbine manufacturer.

Noram Lithium has engaged Ausenco Engineering Canada Inc. to lead the Pre-Feasibility Study (PFS) of its 100% owned Zeus Lithium Project in Clayton Valley, Nevada.

The pumps are working at an open pit gold mine in Surigao del Norte, in the island province of Caraga, Philippines, enabling the diversion of ground and runoff water.

Gold production of 60 092 oz was mainly driven by contributions of 25 258 oz from the Lindero Mine and 26 437 oz from the Yaramoko Mine.

High-grade, near surface intercepts reported in the 109 Footwall Zone, including 2.4% Ni, 4.3% Cu, 37.2 g/t Pt + Pd + Au over 5.1 m.

Anglo American plc has announced the value of rough diamond sales (Global Sightholder Sales and Auctions) for De Beers’ third sales cycle of 2023.

The company is developing 2 ore bodies and requires geo-metallurgical ore hardness testing to design SAG mills using data from the entire ore body for each plant.