Skip to main content

Worley to provide engineering services to South32’s Hermosa project

Published by , Editorial Assistant
Global Mining Review,


Worley has been awarded a contract to provide detailed engineering and procurement services for the underground infrastructure and the surface non-process facilities of the zinc-lead-silver Taylor deposit at South32’s Hermosa project in Arizona.

Worley to provide engineering services to South32’s Hermosa project

Under this contract, Worley will support the design and procurement of underground mechanical and electrical infrastructure for excavation, power distribution, and dewatering, along with maintenance and ore handling systems.

Worley will also integrate ventilation, shaft transport, and communication infrastructure for the underground operations, as well as the design for the surface non-process facilities.

Its project team will be based in Phoenix, Arizona, but it will draw on mining experts from around the world to help South32 and its other partners to ensure safety in design and timely execution of the project.

The Hermosa project targets 75% less water usage compared to other mines in the region. It will also incorporate automation and advanced technologies to further reduce CO2 emissions associated with the mine.

“This is our first project with South32 in North America, underlining our dedication to the US mining sector while helping provide minerals that are essential for the energy transition,” said Tom Foster, President US Operations and Worley Consulting.

“Collaborating with South32, we’ll work to enable a data-centric, ‘digital asset’ approach, ensuring seamless updates, operations, maintenance, and future expansions throughout the mine's lifecycle. This innovative approach will be underpinned by our expertise in project delivery, both underground and at the surface. We look forward to working alongside South32 and other project partners to deliver this critical project.”

Read the article online at: https://www.globalminingreview.com/mining/30052024/worley-to-provide-engineering-services-to-south32s-hermosa-project/

You might also like

The progress and promise of hybrids in mining

Decarbonising mining is challenging. While electric and hydrogen solutions show promise, they are still in development and not yet reliable for heavy equipment in demanding environments due to tough conditions and varying infrastructure across regions.

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

US mining news