The property is located on Indigenous land. Maven has opened discussions and engagement with First Nations and Indigenous groups as part of its project evaluation, alongside geological work, environmental planning, and permitting considerations. The company recognises that people who live in the area have longstanding relationships with the land and must have meaningful opportunities to participate in conversations about activities that may affect them.
Beth Borody, Founder and CEO of Maven Exploration:
“From the beginning, we wanted our first project to reflect how we believe mineral exploration should work. That means taking time to understand the land, the people who live there, and the geology before deciding what comes next. Hathor gives us an opportunity to put that approach into practice. We have encouraging geological information, but we still have more to learn. Both are important to the decisions we make.”
How Maven found the Hathor opportunity
Throughout due diligence, the team worked directly with the mineral claim holders, including Ken Nelson, to evaluate the opportunity using the Maven Way, its method for considering geological, environmental, social, and permitting factors before making investment decisions. Following this evaluation, Maven and the claim holders reached an option agreement.
The evaluation began with a desktop study that reviewed existing geological information, previous exploration results, land records, environmental information, and permitting requirements. Maven then visited the property to better understand its physical conditions, including access, terrain, streams, and forest cover.
Peggy Bell, Co-founder and COO of Maven Exploration:
“We reached a positive conclusion after completing our site visit at the end of October. The results from past studies, our conversations with rights holders and community members, and the collaborative relationship we developed with the claim holders made Hathor an exciting opportunity to pursue. We look forward to getting back to the Prince George area early in 2027 to continue learning about the project’s above-ground context before embarking on our first field season in the spring.”
Why the name Hathor?
Maven has named the project Hathor after the ancient Egyptian goddess associated with copper mining and the protection of miners. A shrine dedicated to her stood at the Timna copper mines, where it served Egyptian miners and later local communities. The name connects our interest in copper with a longer history of people, culture, and mining. For Maven, the name also reflects our commitment to building relationships with rights holders and communities, considering land, people, and resources together, and sharing what we learn in plain language.
Project details
Hathor covers approximately 3083 ha. across five mineral claims, less than 35 km south to southeast of Prince George. Mineral claims are registered rights to explore for minerals within a defined area, subject to applicable laws and permissions. They do not grant ownership of the surface land or replace Indigenous rights.
Previous exploration identified copper in rock and soil samples, along with indications of nickel, cobalt, and molybdenum. Magnetic surveys, which measure variations in the Earth’s magnetic field to help geologists understand the rocks beneath the surface, have also identified areas that warrant further investigation.
One geological possibility being examined is a porphyry copper system. These deposits form when hot, mineral-rich fluids associated with cooling magma leave copper minerals within and around underground rock formations. Porphyry deposits are a major source of the world’s copper, but further work is needed to determine whether Hathor hosts this type of system.
Past work at Hathor helped set priorities for the next stage of exploration. Maven is now preparing a Notice of Work application for its proposed 2027 field program, which includes additional surface sampling, sample analysis, and geophysical surveys.
Environmental baseline studies are another priority. These studies document existing conditions, including water, soil, and wildlife, so the team can plan future activities and evaluate potential effects.
The timing and scope of further exploration will depend on the evidence collected, continued engagement with affected rights holders and communities, land access, permitting requirements, and available funding.
Hathor remains an early-stage exploration project. The property currently has no defined mineral resource, and further testing is needed to support the geological interpretations.




