Assembly of RopeCon installation at Booysendal concession begins
Published by Nicholas Woodroof,
Editor
Global Mining Review,
Assembly has started for the first of the two RopeCon® installations for the transport of platinum ore at the Booysendal concession in South Africa.
Booysendal Platinum Ltd, a subsidiary of Northam Platinum Ltd, accesses the platinum ore deposit Booysendal South there. To transport the mined ore to an existing processing plant, Doppelmayr Transport Technology GmbH, headquartered in Austria and a subsidiary of the Doppelmayr group, will build a RopeCon® system.
After the completion of the foundation works, the actual assembly of the system will begin. The system is due to start operations at the beginning of 2019. From then on, it will transport the ore over a length of 4.9 km in steep terrain.
Read the article online at: https://www.globalminingreview.com/mining/20022018/assembly-of-ropecon-installation-at-booysendal-concession-begins/
You might also like
Metso wins grinding mill contract for Viscaria copper mine in Sweden
Gruvaktiebolaget Viscaria has placed an order with Metso for the supply of two horizontal grinding mills for its newly reopened copper mine located in Kiruna, northern Sweden.