Coal Authority awarded contract for colliery tip and quarry inspections in Wales
The work involves 315 inspections at 291 sites in south Wales, including disused colliery tips, quarries and civil engineering structures.
The work involves 315 inspections at 291 sites in south Wales, including disused colliery tips, quarries and civil engineering structures.
Weba Chute Systems has developed and patented certain flow designs for its equipment that keep dust levels as low as possible.