Akobo Minerals AB, the Scandinavian-based gold producer operating the Segele underground gold mine in Ethiopia, one of the world's highest-grade underground gold mines, provides an operational update.

Akobo Minerals issues an operational update for August 2026

August delivered approximately 16 kg of doré gold at an average grade of 26 g/t, making it the company's second-best production month to date. Cumulative gold production has now reached approximately 158 kg since start-up. The grade achieved is exceptionally high by international underground mining standards and underlines the high-grade nature of the Segele deposit. The combination of high grades and solid operational performance supported strong gold production from the Segele mine.

As previously communicated, the processing plant continues to operate in batch campaigns rather than continuously. As a result, monthly processed tonnage and stockpile levels may vary depending on the timing of each processing campaign.

Key highlights

  • Doré gold production: approximately 16 kg @ 26 g/t.
  • Doré gold production to date: approximately 158 kg @ 24 g/t.
  • Stockpile available for processing: approximately 700 t.
  • Remaining vertical shaft development: approximately 54 m.

Development of the vertical shaft continued during the month. Progress was slower than planned as work focused on carefully advancing through challenging softer rock conditions.

An important next step is the start-up of the first lateral into the orebody. This is expected to commence from the eastern winze and subsequently from the vertical shaft, allowing development to progress from both directions and reducing overall development time. Once the first lateral is completed, the company will commence hoisting gold-bearing ore from the shaft.

At the same time, substantial progress was made across a range of parallel activities that are equally important for the successful commissioning of the shaft. These included mine planning, geological model updates and surface works around the shaft area, including levelling and infrastructure preparation to support future shaft operations and logistics.

Site work is also progressing on key infrastructure supporting future operations, including a new treatment water storage dam and the new tailings storage facility.

Read the article online at: https://www.globalminingreview.com/mining/08092026/akobo-minerals-issues-an-operational-update-for-august-2026/

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

African mining news Gold mining news European mining news