Bedeschi collaboration with EGA in Africa
Published by John Williams,
Editorial Assistant
Global Mining Review,
At the beginning of this year, Bedeschi was awarded a bauxite storage facility for Guinea Alumina Corporation part of Emirates Global Aluminium (EGA) in ABU DABHI by DTP Mining, part of Bouygues Construction (France).
The plant is located in Kamsar, the Boke Region North of Guinea, and the scope of supply includes a stacker with a capacity of 3000 tph and a 420 m long storage belt conveyor. The commissioning phase was performed in September 2018.
It is a stacker for handling bauxite both in dry and wet conditions, when the material becomes sticky due to the humidity. The material is stored in two stockpiles of 160 000 t each with chevron method. The machine has a capacity of 3000 tph, a 42 m long boom and a length of 1400 mm.
Read the article online at: https://www.globalminingreview.com/mining/04122019/bedeschi-collaboration-with-ega-in-africa/
You might also like
WARMAN® AH® horizontal slurry pump celebrates 60 years as the number one heavy-duty slurry pump in the world
Weir, a mining technology company, proudly marks the 60th anniversary of its iconic WARMAN® AH® horizontal slurry pump. Since its debut in 1965, the pump has set the global standard for operational performance, equipment reliability, and innovation in slurry handling.