Skip to main content

Metso signs contract for the delivery of a copper concentrator to Kazakhstan

Published by , Editor
Global Mining Review,


Metso has signed a contract for the delivery of a new copper concentrator to be built in Kazakhstan.

The order value of approximately €85 million is booked in the Minerals segment’s third-quarter 2023 orders received.

Metso’s scope of delivery consists of the main process equipment for grinding, flotation, and dewatering. This includes: HIGmill® high-intensity grinding mills; TankCell® flotation cells in different sizes in the 30 – 630 m3 range; Larox® PF pressure filters; high-rate thickeners (HRT); an on-line sampling and analysing system; as well as field instrumentation and Proscon® automation for the whole concentrator plant.

Read the article online at: https://www.globalminingreview.com/mining/04102023/metso-signs-contract-for-the-delivery-of-a-copper-concentrator-to-kazakhstan/

You might also like

Halliburton awarded lithium well project by GeoFrame Energy

Halliburton has been awarded a contract for GeoFrame Energy’s geothermal and direct lithium extraction (DLE) project, through which it will plan and design the first demonstration phase wells in the Smackover Formation in East Texas.

 
 

Embed article link: (copy the HTML code below):


 

This article has been tagged under the following:

Asian mining news Copper mining news Mining equipment news