4.5 km ropeway connects Turkish mine and valley
The ropeway took up operation in December 2017 and has since been transporting 60 tph of copper ore from the Cerattepe underground copper mine to a river over a distance of 4.5 km.
The ropeway took up operation in December 2017 and has since been transporting 60 tph of copper ore from the Cerattepe underground copper mine to a river over a distance of 4.5 km.