Bedeschi collaboration with EGA in Africa
Published by John Williams,
Editorial Assistant
Global Mining Review,
At the beginning of this year, Bedeschi was awarded a bauxite storage facility for Guinea Alumina Corporation part of Emirates Global Aluminium (EGA) in ABU DABHI by DTP Mining, part of Bouygues Construction (France).
The plant is located in Kamsar, the Boke Region North of Guinea, and the scope of supply includes a stacker with a capacity of 3000 tph and a 420 m long storage belt conveyor. The commissioning phase was performed in September 2018.
It is a stacker for handling bauxite both in dry and wet conditions, when the material becomes sticky due to the humidity. The material is stored in two stockpiles of 160 000 t each with chevron method. The machine has a capacity of 3000 tph, a 42 m long boom and a length of 1400 mm.
Read the article online at: https://www.globalminingreview.com/exploration-development/04122019/bedeschi-collaboration-with-ega-in-africa/
You might also like
Epiroc breaks ground on new global distribution centre in Sweden
Epiroc AB, a leading productivity and sustainability partner for the mining and infrastructure industries, is breaking ground on a new major distribution centre in Örebro, Sweden. The top-modern facility will be a global hub for Epiroc’s aftermarket products, benefiting customers by enabling a more efficient supply of goods.